GDS Connectivity
Global Distribution System integration with Amadeus, Sabre, and Travelport.
Scope
- Amadeus: Largest global reach, strong in Europe
- Sabre: Strong in Americas, corporate travel
- Travelport: Galileo, Apollo, Worldspan combined
Core Functions
- Schedule distribution (SSIM)
- Availability and pricing
- Booking creation (PNR)
- Ticketing
- Fare filing display
- Queue management
Messaging Protocols
- EDIFACT: Traditional airline messaging
- XML: Modern API layer
- Type B (Teletype): Legacy but still used
Research Topics
Architecture Considerations
GDS Integration Patterns
Airline Systems
│
▼
┌─────────────┐
│ GDS Gateway │ ◄── Message transformation
└──────┬──────┘
│
┌───┴───┐
│ │
┌──▼──┐ ┌──▼──┐
│EDIFACT│ │ XML │
└──┬──┘ └──┬──┘
│ │
▼ ▼
GDS Networks
Message Types
Availability
- AVS (Availability Status) - Real-time availability
- SSL (Standard Schedule Limits) - Schedule-based availability
Booking
- PAORES - Booking response
- PNRADD - Add elements to PNR
- PNRRET - Retrieve PNR
Ticketing
- TKTRES - Ticket issuance response
- TKTREQ - Ticketing request
Participation Levels
- Full Content: All fares, all inventory
- Partial: Limited fare families
- Private Channel: Corporate-only fares
Integration Points
| System | Direction | Data |
|---|
| Inventory | Outbound | AVS messages |
| Schedule | Outbound | SSIM distribution |
| Fares | Outbound | Fare filing |
| Reservations | Bidirectional | PNR sync |
| Ticketing | Bidirectional | Ticket issuance |
GDS Economics
Cost Structure
| Fee Type | Typical Range |
|---|
| Booking Fee | $4-12 per segment |
| Full Content Incentive | -$2-4 per segment |
| Marketing Fund | Variable |
| IT Fees | Monthly subscription |
Surcharge Strategy
- EU regulation allows GDS surcharges
- US DOT requires display regardless of surcharge
- Implementation via booking class or fare rule
Migration Considerations
NDC Transition
- Maintain GDS for legacy TMC connectivity
- Offer parity requirements
- Gradual volume shift to NDC
- Corporate travel tool compatibility
Timeline
- Short-term: Full GDS participation
- Medium-term: NDC alongside GDS
- Long-term: NDC-primary, GDS-minimal